Electronic Lab Notebook for Illimar Rekand, working on establishing a closed loop system with the Unchained Labs at HTE@UiB. Entries are written chronologically from top to bottom.
Electronic Lab Notebook for Illimar Rekand, working on establishing a closed loop system with the Unchained Labs at HTE@UiB. Entries are written chronologically from top to bottom.
<!-- The TOC below will autoupdate if saved in VSCode with the Markdown-all-in-one extension installed -->
-[Entry 1: Physical test using exe scripts](#entry-1-physical-test-using-exe-scripts)
-[Entry 1: Physical test using exe scripts II](#entry-1-physical-test-using-exe-scripts-ii)
-[2024-11-20](#2024-11-20)
-[2024-11-20](#2024-11-20)
-[Entry 1: Weekly meeting with Unchained Labs](#entry-1-weekly-meeting-with-unchained-labs)
-[Entry 1: Weekly meeting with Unchained Labs](#entry-1-weekly-meeting-with-unchained-labs)
-[2024-11-19](#2024-11-19)
-[2024-11-19](#2024-11-19)
-[Entry 1: Physical test using exe scripts](#entry-1-physical-test-using-exe-scripts-1)
-[Entry 1: Physical test using exe scripts I](#entry-1-physical-test-using-exe-scripts-i)
-[2024-11-18:](#2024-11-18)
-[2024-11-18:](#2024-11-18)
-[Entry 1:](#entry-1)
-[Entry 1:](#entry-1)
-[Entry 2](#entry-2)
-[Entry 2](#entry-2)
...
@@ -38,9 +38,9 @@ Looking at the chemical manager file, I'm still unsure how good of a model the V
...
@@ -38,9 +38,9 @@ Looking at the chemical manager file, I'm still unsure how good of a model the V
### 2024-11-21
### 2024-11-21
### Entry 1: Physical test using exe scripts
### Entry 1: Physical test using exe scripts II
With the suggestions from yesterday's meeting, a physical test was done with a new library id. Test was succesful.
With the suggestions from yesterday's meeting, a physical test was done with a new library id (350). Test was succesful.
### 2024-11-20
### 2024-11-20
...
@@ -60,7 +60,7 @@ furthermore;
...
@@ -60,7 +60,7 @@ furthermore;
### 2024-11-19
### 2024-11-19
#### Entry 1: Physical test using exe scripts
#### Entry 1: Physical test using exe scripts I
Ran a physical test of yesterday's script with hardware enabled. The wells are dispensed correctly, but a second map dispenses 1000 uL to all wells A1 to A6. This map is probably an artefact from the method used at UBC, which I did update to 1000 uL in my testing.
Ran a physical test of yesterday's script with hardware enabled. The wells are dispensed correctly, but a second map dispenses 1000 uL to all wells A1 to A6. This map is probably an artefact from the method used at UBC, which I did update to 1000 uL in my testing.